Inertial Sensing Systems for Advanced Chronic Condition Monitoring and Risk Prevention

Deliverables List

The work plan is broken down according to the following types of activities: Project Management (WP1), Research and Development (WP2, WP4), Technological Development (WP3, WP5), Validation (WP6), and Innovation Dissemination and Exploitation (WP7).

Del. no. Deliverable name WP no. Delivery date
D2.1 Requirements analysis 2 M5
D2.2 Architecture specification 2 M10
D3.1 Hardware platform and software packages for wireless networking 3 M19
D3.2 Software packages for sensor interfacing, calibration and filtering 3 M23
D4.1 Distributed feature extraction 4 M23
D5.1 User interaction and feedback 4 M28
D4.2 Activity recognition algorithms 5 M31
D4.3 Learning and adaptation techniques 4 M34
D5.2 System integration in free-living environments 5 M34